A Bill of Quantities (BOQ) eliminates ambiguity. We dissect your architectural drawings to create a granular list of thousands of items required for construction. No guesswork, just pure engineering data.

Item: Excavation 1200 CFT
Item: PCC (1:4:8) 450 CFT
Item: TMT Bar 12mm 2.5 TON
Item: Brickwork 1500 SQFT
Item: Plaster 12mm 3000 SQFT
TOTAL ITEMS: 1450+
THE CONTRACTOR'S BIBLE

INTERACTIVE DATA SHEET

Hover over the items below to see how we derive quantities using L x B x D formulas.

SR.
DESCRIPTION OF ITEM
UNIT
QUANTITY
EST. RATE
01
Earth Work in Excavation Foundation trenches in hard soil.
Formula: L (40') x B (3') x D (4') = 480 CFT
Cum
125.50
₹ 350.00
02
RCC M25 Grade Columns, Beams, Slabs (1:1:2).
Formula: 12 Cols x (0.75' x 1.5' x 10') = 135 CFT
Cum
45.00
₹ 6,500.00
03
TMT Steel Reinforcement Fe 500D Bars (Cutting, Bending, Binding).
BBS: Total Length x Unit Wt (0.89 kg/m)
Kg
4,250.00
₹ 72.00
04
Class A Brickwork 9" Thick walls in 1:6 Cement Mortar.
Deduction: Total Wall Area - (Door/Window Area)
Sqm
320.00
₹ 5,800.00

WHY WORK WITH A BOQ?

Apple-to-Apple Comparison

When tendering, every contractor quotes for the exact same quantity. No "hidden extra costs" later.

Material Scheduling

Know exactly when to order 500 bags of cement so they don't spoil on site.

Dispute Resolution

If the contractor claims "extra work", the BOQ proves what was originally agreed upon.

Cost Control

Track project progress against the BOQ. If you used 50% budget but did only 30% work, you know instantly.

What You Receive

  • Excel (.xls) Editable Format
  • PDF Print-Ready Sheets
  • Abstract Sheet (Summary Cost)
  • Measurement Sheets (Detailed Calc)