|

GRIH PRAMARSHI

Architects +Engineers + interior + Arts = Grih Pramarshi. We Design, We Build, We Deliver. Smart Design. Strong Construction. Timely Delivery.
Grih Pramarshi Navbar
Explore Services

Classic Package

Our best seller package with upgraded brand like Jindal steel, hardware etc at considerable price.
2100 per sqft

Package Highlights

Superior brand steel and cement
Redefine Floor Tiles Up to 100 /Sqft
Elegant teak door and window Finish
Stylish Kitchen And Bathroom.

1. General Details

Package NameCLASSICUpgraded Package Focusing on Structure Integrity and Better Fitting
Rate2100 per sqftIncludes all construction essentials as specified below.
Quality GoalStandard to High StandardUtilizing Superior brand for core structural components.
Plinth Height3 - 4 ftFrom Normal Ground Level (NGL).
Ceiling Height10 - 11 ftFloor to floor.

2. Structure & Core Materials

Steel (Fe 550 SD Grade)JSW NEOSTEEL / SAIL / JINDAL PANTHER EquivalentsHighest - trusted brand
Cement (OPC/PPC)Shree / Ambuja / JK / EquivalentsHighest - trusted brand
SandSon SandLocally Available.
Aggregate20mm / 10mmLocally Available (PAKHUR).
Concrete GradeM20/M25Allowing For M 25 Grade Concrete for Enhanced Durability.
Brickwork1 ST CLASS Brick10-inch outer walls, 5-inch inner walls.
Anti-Termite TreatmentKnown brand applicationOn foundation and plinth level.

3. Doors & Windows

Main DoorTeak Door With Teak FrameUp to 30,000 (including accessories).
Internal DoorsMembrane / Flush door with laminatesUp to 9,000 per door.
Puja Room DoorNormal DoorStandard flush door/panel door.
Bathroom DoorsWaterproof Flush Doors Or WPCGood Quality.
Windows3 Track with 1 MeshUPVC Windows, 500 Per Sqft of NEXIA LESSO ELIT.
Window GrillsBasic Design MS Grill200 per sqft.

4 & 5. Flooring & Painting

FLOORING & STAIRCASE
Living & DiningTiles / GraniteUp to 100 per sqft.
Rooms & KitchenTiles / GraniteUp to 80 per sqft.
Balcony & Open AreaAnti-Skid TilesUp to 60 per sqft.
Staircase StepsGraniteUp to 80 per sqft.
Parking AreaAnti-Skid TilesUp to 50 per sqft.
Laying ChargesStandardWill be factored into overall rate.
Staircase RailingMS /SS RailingStandard design and finish.
PAINTING
Interior PaintingPutty + Primer + EmulsionAsian Paints - JK Putty, Primer, Tractor SHYNE Emulsion.
Exterior PaintingPrimer + Exterior EmulsionAsian Paints - Primer, APEX Exterior Emulsion.

6, 7 & 8. MEP & Fittings

ELECTRICALS
WiringFireproof WiringFinolex / Anchor / Havells.
Switches & SocketsModularLegrand Allzy / HI-FI / Great White.
UPS WiringProvisionProvision (As specified).
KITCHEN
Wall DadoCeramic Tiles up to 2 ft heightUp to 60 per sqft.
SinkSingle Bowl SS (Stainless Steel)Up to 6000.
Sink FaucetStandardUp to 2000.
AccessoriesStandard AccessoriesPARRYWARE /HINDWARE/JAGUAR.
BATHROOM
Wall DadoCeramic Tiles up to 7 ft heightUp to 60 per sqft.
Sanitary & CP FittingsStandardUp to 50,000 per 1000 sqft (Hindware or equivalent).
Plumbing PipesCPVC PipeSupreme / Hindware/ASTERAL.
AccessoriesStandard AccessoriesNone (As specified: "no" accessories).
WATER STORAGE
Overhead TankDouble LayeredApollo / Equivalent make.
Capacity1500 LitersSpiral makes.

Legal & Warranties

COMMERCIAL, SCOPE & RISK CLAUSES
Design ModificationsA design, if needed to be modified more than thrice, shall be charged for accordingly.
Plan Sanction & FeesGovernment fees for the liaison bodies to be paid directly by the client.
Ground LevellingAssuming the site and road level to be equal, if ground level needs to be raised above 18 inches, it shall be charged.
Excavation RisksHard rock/soft rock excavation, if it arises, shall be charged on actuals.
Earthwork ChargesBuying new earth/sending existing earth for excavation/backfilling purpose shall be charged on actuals.
Escalation ClauseBasic price of Cement is up to ?380 per bag & Steel up to ?60,000 per MT. Increase shall be charged accordingly.
Openings LimitPercentage of opening for doors & windows – 20% of built-up area Maximum.
Scope LimitationAny work not mentioned within this package or outside the site boundary shall be charged.
Client ProvisionsOne point of Electricity & water needs to be provided by the client free of cost.
Foundation DepthSBC of soil is considered at 180 KN/M2 and depth of the foundation 4-5 Feet. Any increase in depth charged on actuals.
Material DeliveryConstraints in material delivery or stocking place charged on actuals.
Site Provision (Shed)Specific area to construct labour and material shed needs to be provided within 50 feet.
Utility ConnectionRoad cutting charges for Electricity/Sewage lines not included.
STRUCTURAL WARRANTY
Structure (10 Years)Covers major structural defects, including collapse, or failure compromising stability.
Waterproofing (5 Years)Covers waterproofing failure in critical areas (terrace, sunken slabs, overhead tanks).
WORKMANSHIP WARRANTY
General Workmanship (1 Year)Covers defects arising directly from poor installation (e.g., uneven plastering, loose tiles).
Internal/External Plastering (1 Year)Covers defects such as flaking, major cracking.
Plumbing Work (1 Year)Covers leakage in concealed or exposed pipe joints installed by builder.
Electrical Wiring (1 Year)Covers defects in wiring continuity and installation.
MANUFACTURER WARRANTIES
Core MaterialsSteel (Fe 550 SD), Cement, Concrete MixBuilder guarantees use of specified quality/brand; Manufacturer guarantees product integrity.
Fittings & FixturesSanitaryware, CP FittingsManufacturer provides warranty against defects in material and finish.
PaintsAsian PaintsManufacturer provides warranty against paint peeling/fading.
ElectricalsWiring, SwitchesManufacturer provides warranty against product failure.
Ultra Advanced Footer